DocumentCode
2424003
Title
Analysis on the Pre-qualification System of Construction Project Bidding
Author
Xu Bing ; Guan Xia
Author_Institution
Dept of Constr. Manage., North China Univ. of Technol., Beijing, China
fYear
2010
fDate
7-9 May 2010
Firstpage
2652
Lastpage
2655
Abstract
The pre-qualification is an important work in the process of bidding projects. Its aims are to choose a qualified bidder who has experience, competence, reputation to undertake the project. However, there are a lot of problems in China´s current tender work. Based on related laws and engineering practice activities in the area of project bidding, this paper analyses the status, problems and their causes of pre-qualification in the process of project bidding. On the basis of comparing with some mature foreign practices, this paper put forward corresponding recommendations about improving China´s pre-qualification system.
Keywords
construction industry; pricing; project management; bidding projects; construction project bidding; pre-qualification system; Book reviews; Companies; Construction industry; Economics; Materials; Qualifications; Standards; Construction Project; bidding; pre-qualification;
fLanguage
English
Publisher
ieee
Conference_Titel
E-Business and E-Government (ICEE), 2010 International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-0-7695-3997-3
Type
conf
DOI
10.1109/ICEE.2010.670
Filename
5592047
Link To Document