• DocumentCode
    2424190
  • Title

    Using innovative electrical and electronic devices in the reduction of panel size

  • Author

    Portillo, Levi ; Woolard, Sam

  • Author_Institution
    TNMP, Texas City, TX, USA
  • fYear
    2010
  • fDate
    March 29 2010-April 1 2010
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    Good substation panel design must take into account many requirements. One important factor is panel size. TNMP has over the last years employed new storage media, state of the art relays and a reduced number of test interfaces to reduce overall front panel size by 60%. The harmonization of all these devices calls for an advanced testing and maintenance approach. The close interaction of panel design with maintenance and asset management is improving TNMP´s operating procedures. While we are continually challenged by the rugged environment of our installations (part of TNMP´s service area includes one of the largest refinery complexes in the country), our substations are at the forefront of automation. This paper intends to look at panel design from a fresh perspective. Based on the real-world experience of TNMP, panel space and installation costs savings will be discussed and quantified.
  • Keywords
    maintenance engineering; substations; testing; advanced testing approach; asset management; electronic devices; innovative electrical device; maintenance approach; substation panel design; test interfaces; Aging; Circuit testing; Condition monitoring; Maintenance; Power system protection; Power system relaying; Power system reliability; Protective relaying; Remote monitoring; Substation protection;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Protective Relay Engineers, 2010 63rd Annual Conference for
  • Conference_Location
    College Station, TX
  • Print_ISBN
    978-1-4244-6073-1
  • Type

    conf

  • DOI
    10.1109/CPRE.2010.5469506
  • Filename
    5469506