    The algorithm of cash flow forecasting in planning stage for construction project

  • Author

    Kim, Min Ock ; Park, Hyung Keun

  • Author_Institution
    Sch. of Civil Eng., Chungbuk Nat. Univ., Cheongju, South Korea
  • fYear
    2012
  • fDate
    11-13 June 2012
  • Firstpage
    674
  • Lastpage
    677
  • Abstract
    The study suggests an algorithm, which forecasts cash flow in a planning stage to manage a liquidity crisis effectively. The algorithm involves calculation of optimal cash level considering time lag, item costs, and weight of items for construction projects. It also suggests a forecast of cash flow after a comparison of cash-in and cash-out with the simulation of billing time lag according to the earned value and time lag of each item. Forecasts on cash flow, moreover, are made using various simulations on the component ratio of each item according to the budget. Therefore, this study aims to provide a solution to liquidity problems from insufficient cash and a good measure to forecast a proper level of cash flow.
  • Keywords
    construction industry; financial management; forecasting theory; planning; project management; billing time lag simulation; cash flow forecasting; cash-in; cash-out; construction project; liquidity crisis management; optimal cash level calculation; planning stage; Biological system modeling; Buildings; Companies; Educational institutions; Forecasting; Planning; Predictive models; Algorithm; Cash Flow; Cash-In; Cash-Out; Construction; Time Lag;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management of Innovation and Technology (ICMIT), 2012 IEEE International Conference on
  • Conference_Location
    Sanur Bali
  • Print_ISBN
    978-1-4673-0108-4
  • Type

    conf

  • DOI
    10.1109/ICMIT.2012.6225887
  • Filename
    6225887