• DocumentCode
    2435621
  • Title

    Analytic hierarchy process applications in the construction of the project tender

  • Author

    Cao, Hongliang

  • Author_Institution
    Dept. of Econ. & Manage., Hunan First Normal Univ., Changsha, China
  • fYear
    2011
  • fDate
    8-11 Jan. 2011
  • Firstpage
    274
  • Lastpage
    277
  • Abstract
    This paper stated the impact of the application of the analytic hierarchy process (referred to as the AHP) factors on construction project bidding. In order to eliminate subjective factors on the results of the tender, indicators (program) is obtained by pairwise comparing the importance of the weight of each index, and determine the pros and cons of each program sort. Finally the evaluation and determination of the fair and scientific method determine the successful tender.
  • Keywords
    decision making; project management; tendering; AHP factor; analytic hierarchy process application; construction project bidding; project tender construction; Companies; Economics; Indexes; Materials; Standards organizations; AHP; construction project; evaluation and determination method; tender;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management Science and Industrial Engineering (MSIE), 2011 International Conference on
  • Conference_Location
    Harbin
  • Print_ISBN
    978-1-4244-8383-9
  • Type

    conf

  • DOI
    10.1109/MSIE.2011.5707715
  • Filename
    5707715