Analysis of risk in EPC project and the countermeasures
Author
An, Hui ; Shuai, Qin
Author_Institution
Coll. of Hydraulic & Environ. Eng., China Three Gorges Univ., Yichang, China
fYear
2011
fDate
8-11 Jan. 2011
Firstpage
424
Lastpage
428
Abstract
This paper analyzes the characteristics of EPC project, the owner is only responsible for the whole and principled management and control of the goal; the contractor undertakes most risks; the owner only signs a project general contract with EPC general contractor, which adopts the lump sum contract; and the transaction cost of EPC mode is lower etc. Based on the analysis above, this paper explains that risk management is more important for EPC project. Then through the contrasting approaches and positivist methods, this paper comes to a conclusion: in the engineering construction of EPC project, owner and the general contractor should get a clear understanding of the situation and make a reply rationally. And at last the paper proposes some countermeasures to the specific risks.
Keywords
contracts; costing; project management; risk analysis; EPC general contractor; EPC project; lump sum contract; positivist methods; principled management; risk analysis; risk countermeasure; risk management; transaction cost; Contracts; Force; Law; Materials; Procurement; Project management; Risk management; EPC Project; countermeasures; risk assessment; risk management;
fLanguage
English
Publisher
ieee
Conference_Titel
Management Science and Industrial Engineering (MSIE), 2011 International Conference on
Conference_Location
Harbin
Print_ISBN
978-1-4244-8383-9
Type
conf
DOI
10.1109/MSIE.2011.5707753
Filename
5707753
Link To Document