• DocumentCode
    2442106
  • Title

    Photovoltaic system reliability

  • Author

    Maish, Alexander B. ; Atcitty, Christopher ; Hester, Steve ; Greenberg, Daniel ; Osborn, Don ; Collier, David ; Brine, Malissa

  • Author_Institution
    Sandia Nat. Labs., Albuquerque, NM, USA
  • fYear
    1997
  • fDate
    29 Sep-3 Oct 1997
  • Firstpage
    1049
  • Lastpage
    1054
  • Abstract
    This paper discusses the reliability of photovoltaic projects including SMUD´s PV Pioneer project, various projects monitored by Ascension Technology, and the Colorado Parks project. System times-to-failure range from 1 to 16 years, and maintenance costs range from 1 to 16 cents per kilowatt-hour. Factors contributing to the reliability of these systems are discussed, and practices are recommended that can be applied to future projects. This paper also discusses the methodology used to collect and analyze PV system reliability data
  • Keywords
    maintenance engineering; photovoltaic power systems; power system reliability; Ascension Technology; Colorado Parks project; PV system reliability data; SMUD PV Pioneer project; Sacramento Municipal Utility District project; grid-independent systems; grid-tied systems; maintenance costs; photovoltaic system reliability; system times-to-failure; Cost function; Failure analysis; Laboratories; Maintenance; Manufacturing; Photovoltaic systems; Reliability; Silicon; Solar power generation; US Department of Energy;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Photovoltaic Specialists Conference, 1997., Conference Record of the Twenty-Sixth IEEE
  • Conference_Location
    Anaheim, CA
  • ISSN
    0160-8371
  • Print_ISBN
    0-7803-3767-0
  • Type

    conf

  • DOI
    10.1109/PVSC.1997.654269
  • Filename
    654269