• DocumentCode
    2446301
  • Title

    Use of IEC61850 in a 400kV cable monitoring system

  • Author

    Crompton, Lawrence ; McManus, Paul ; Tart, Nick ; Waite, Keith

  • Author_Institution
    Siemens Transmission and Distribution Ltd
  • fYear
    2012
  • fDate
    23-26 April 2012
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The project to install new cables in the Woodhead Tunnel forming part of National Grid´s (NGET) 400kV transmission system running across the Pennines, requires a state of the art cable monitoring and protection system. The availability of IEC61850 offers the opportunity to provide a simple but effective system in an early long haul application.
  • Keywords
    Circuit faults; Communication cables; Monitoring; Optical fiber cables; Power cables; Protocols; Relays;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Developments in Power Systems Protection, 2012. DPSP 2012. 11th International Conference on
  • Conference_Location
    Birmingham, UK
  • Print_ISBN
    978-1-84919-620-8
  • Type

    conf

  • DOI
    10.1049/cp.2012.0047
  • Filename
    6227535