DocumentCode :
2453049
Title :
Optimizing in advance: Shenzhou 8 space mission scheduling tryout architecture
Author :
Jinjiang, Xing ; Jian, Li ; Hua, Zhu ; Hong, Zhou ; Yuncheng, Feng
Author_Institution :
Beijing Aerosp. Control Center, Beijing, China
fYear :
2010
fDate :
24-27 Aug. 2010
Firstpage :
152
Lastpage :
155
Abstract :
To provide best scheduling solution for the Shenzhou 8 space mission, the scheduling algorithms and configurations are determined before actual mission platform developing using a tryout architecture in Beijing Aerospace Control Center. The architecture is designed agile and extendable so that various processes can be implemented to validate and optimize the algorithms rapidly. With this architecture, the scheduling solution is designed credible before applied in the formal mission scheduling mainframes.
Keywords :
aerospace computing; optimisation; scheduling; Beijing Aerospace Control Center; optimization; space mission scheduling; tryout architecture; Algorithm design and analysis; Computer architecture; Schedules; Scheduling; Scheduling algorithm; Space missions; Switches; Shenzhou; optimizing; scheduling; space mission; spaceship; tryout;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Science and Education (ICCSE), 2010 5th International Conference on
Conference_Location :
Hefei
Print_ISBN :
978-1-4244-6002-1
Type :
conf
DOI :
10.1109/ICCSE.2010.5593670
Filename :
5593670
Link To Document :
بازگشت