    Analysis on mechanical characters of long span continuous bridge pier in cut jacking construction

  • Author

    Yan, Xing-fei ; Nian, Fu-long ; Wang, Luo-ying ; Li, Fang-yuan

  • Author_Institution
    Div. of Road & Bridge, Shanghai Urban Constr. Design & Res. Inst., Shanghai, China
  • fYear
    2011
  • fDate
    24-26 June 2011
  • Firstpage
    3846
  • Lastpage
    3849
  • Abstract
    As the longest span concrete bridge to be jacked up in China, this paper introduced the whole jacking plan for the long span continuous bridge in detail, presented the key mechanical characters in the construction stage when cut the main piers, suggested the measure to reduce the cracking stress to insure the safety.
  • Keywords
    bridges (structures); cracks; cutting; structural engineering; China; cracking stress reduction; cut jacking construction; jacking planning; long span continuous bridge pier; Bridges; Concrete; Lifting equipment; Roads; Safety; Stress measurement; construction stage; cracking; cutting; jack up; long span continuous bridge;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
  • Conference_Location
    Nanjing
  • Print_ISBN
    978-1-4244-9172-8
  • Type

    conf

  • DOI
    10.1109/RSETE.2011.5965078
  • Filename
    5965078