DocumentCode
2458090
Title
Fluvial morphology analysis of the Yichang navigation channel after the TGP operation
Author
Liu, Huaixiang ; Lu, Yongjun
Author_Institution
State Key Lab. of Hydrol.-Water Resources & Hydraulic Eng., Nanjing Hydraulic Res. Inst., Nanjing, China
fYear
2011
fDate
24-26 June 2011
Firstpage
4063
Lastpage
4066
Abstract
Since 2003, the operation of the Three Gorges project (TGP) has obviously decreased sediment transportation into the downstream Yichang navigation channel. Therefore the erosion & incision of this channel and the deterioration of navigation condition can be expected. A fluvial morphology analysis of Yichang channel was given in this study and the results showed that: the main erosion zone has moved downwards during 2003~2006 so that the roughness coefficient in the near-dam section has increased more than 30%. The riverbed armoring calculation methods based on incipient possibility rather than those based on incipient velocity/grain size were also suggested in this channel for prediction of size distribution.
Keywords
erosion; geographic information systems; geomorphology; grain size; sedimentation; sediments; China; TGP operation; Three Gorges project; Yichang navigation channel; fluvial morphology analysis; grain size; incipient velocity; main erosion zone; navigation condition; near-dam section; riverbed armoring calculation; roughness coefficient; sediment transportation; Electronic mail; Grain size; Laboratories; Morphology; Navigation; Sediments; Transportation; Three Gorges; fluvial morphology; navigation channel;
fLanguage
English
Publisher
ieee
Conference_Titel
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-9172-8
Type
conf
DOI
10.1109/RSETE.2011.5965212
Filename
5965212