DocumentCode :
2463733
Title :
A Study of Real-Time Data Transmission Model of Train-to-Ground Control in High-Speed Railways
Author :
Yang, Yan ; Huang, Zheng-Quan ; Zhong, Zhang-dui ; Fu, Xin
Author_Institution :
State Key Lab. of Rail Traffic Control & Safety, Beijing Jiaotong Univ., Beijing, China
fYear :
2010
fDate :
6-9 Sept. 2010
Firstpage :
1
Lastpage :
5
Abstract :
CBTC (Communication Based Train Control) will be based on mobile communication, which the key problem is how to support reliability of control data transmission to improve track utilization and enhance train safety. This paper proposed a kind of real-time transmission model for high speed train end-to-end control data operation, which based on circuit switched data service by traditional wireless network access to transmit simultaneous instructions between the train operation control system and locomotive. In order to support this end-to-end real-time data application, we have studied a circuit domain latency model and improved a Simple Tunnel Protocol technology to accelerate data service which is easy to be implemented in the network. We have analyzed the performance under different service pressure by using MMPP (Markov Modulation Poisson Process) to describe service traffic pattern and employed a priority scheduling algorithm to estimate approximate service latency. The system simulation showed that data transmission latency should be reduced in busy time by the way of service priority scheduling. Although it might introduce extra traffic expenses and require reservation certain protection circuit, the average standby time probability could be cut down significantly.
Keywords :
Markov processes; circuit switching; probability; protocols; railway communication; railway safety; scheduling; telecommunication network reliability; telecommunication traffic; Markov modulation Poisson process; circuit domain latency model; circuit switched data service; communication based train control; control data transmission; data transmission latency; end-to-end control data operation; end-to-end real-time data application; high speed train; high-speed railways; locomotive; mobile communication; real-time data transmission model; reliability; service latency; service priority scheduling; service traffic pattern; simple tunnel protocol; standby time probability; track utilization; train operation control system; train safety; train-to-ground control; wireless network access; Data models; Delay; Integrated circuit modeling; Markov processes; Protocols; Real time systems; Switching circuits;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Vehicular Technology Conference Fall (VTC 2010-Fall), 2010 IEEE 72nd
Conference_Location :
Ottawa, ON
ISSN :
1090-3038
Print_ISBN :
978-1-4244-3573-9
Electronic_ISBN :
1090-3038
Type :
conf
DOI :
10.1109/VETECF.2010.5594434
Filename :
5594434
Link To Document :
بازگشت