DocumentCode
2467512
Title
Calculated and experimental study on line tension for trailing suction dredger working with shuttle barge
Author
Xinquan Chen ; Yanping He ; Xiaoli Gu ; Jinhong Ding ; Yan Jiang ; Song Zhang ; Jiahua Tan ; Wei Zhuge ; Ji Zhang
Author_Institution
State Key Lab. of Ocean Eng., Shanghai Jiao Tong Univ., Shanghai, China
fYear
2011
fDate
24-26 June 2011
Firstpage
5774
Lastpage
5778
Abstract
To improve dredging efficiency and expand transportation, trailing suction dredger with shuttle barge moored at one side is applied in long distance reclamation projects. Line arrangement and line tension estimation method is established for prototype testing of this new technique. The variation rule of line tension in different operation stage is studied and a program working on optimal relative position of two vessels with minimum deformation energy is put forward. The computational results are evaluated by comparing with experiment data.
Keywords
boats; cables (mechanical); deformation; excavators; transportation; line arrangement method; line tension estimation method; reclamation projects; shuttle barge; trailing suction dredger; transportation; vessels; Boats; Drag; Estimation; Force; Optimization; Prototypes; Resistance; dredging technique; line tension test; optimization; side-by-side moored vessels; suction dredger;
fLanguage
English
Publisher
ieee
Conference_Titel
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-9172-8
Type
conf
DOI
10.1109/RSETE.2011.5965666
Filename
5965666
Link To Document