Title :
Multi-criteria optimization of maintenance activities
Author :
Jeromin, Ingo ; Birkner, Peter ; Balzer, Gerd ; Asgarieh, Leyla
Author_Institution :
Mainova AG, Germany
fYear :
213
fDate :
10-13 June 213
Firstpage :
1
Lastpage :
4
Abstract :
An important task of the asset management process is the evaluation of the long-range investment and resource planning of the assets of the complete power system. The main problem of the asset manager is to reduce the maintenance costs under the condition to keep the availability of the system on a high level. This multi-criteria task is exemplary solved on the basis of three different assets groups (power transformers, circuit-breakers and disconnectors) and in total 75 pieces of equipment of a 110 kV system.
Keywords :
asset management; circuit breakers; maintenance engineering; optimisation; power system management; power system planning; power transformers; asset management process; asset resource planning; circuit breakers; disconnectors; long-range investment; maintenance activities; maintenance cost reduction; multicriteria optimization; multicriteria task; power transformers; voltage 110 kV;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location :
Stockholm
Electronic_ISBN :
978-1-84919-732-8
Type :
conf
DOI :
10.1049/cp.2013.0682
Filename :
6683285
Link To Document :
بازگشت