DocumentCode :
2469210
Title :
Development of load balanced arm work method
Author :
Andou, Y. ; Oohashi, H. ; Honma, K.
Author_Institution :
Distribution Dept., Chubu Electr. Power Co. Inc., Aichi, Japan
fYear :
1998
fDate :
26-30 April 1998
Firstpage :
41
Lastpage :
48
Abstract :
The authors have been shifting distribution line maintenance work from direct live line operation to indirect operation with manipulators and hot sticks for the sake of improving safety and the working environment of workers. The load balanced arm work method (Super-Arm II WorkMethod) is inexpensive but effective in saving labor. It offers the convenience of a manipulator and the maneuverability of hot sticks. The load balanced arm featuring this work method is a single insulated multi-joint arm installed on the bucket of an aerial work platform. This multi-purpose arm, having eight joints, gives workers the feeling of the direct handling of weightless tools. This work method has wide applications other than live line working.
Keywords :
distribution networks; maintenance engineering; power overhead lines; safety; Super-Arm II WorkMethod; aerial work platform; applications; convenience; distribution line maintenance; hot sticks; indirect live line maintenance; load balanced arm work method; maintenance equipment; maneuverability; manipulator; manipulators; overhead power lines; Costs; Design engineering; Electrical safety; Fasteners; Humans; Insulation; Marine safety; Power engineering and energy; Rubber; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission & Distribution Construction, Operation & Live-Line Maintenance Proceedings, 1998. ESMO '98. 1998 IEEE 8th International Conference on
Conference_Location :
Orlando, FL, USA
Print_ISBN :
0-7803-4883-4
Type :
conf
DOI :
10.1109/TDCLLM.1998.668330
Filename :
668330
Link To Document :
بازگشت