DocumentCode
2474177
Title
The urgency of timetable task in course timetable planning
Author
Ting-hong, Yang ; Qi, Dan ; Xiao-na, Shen ; Jing, Zhao ; Li, Xie
Author_Institution
Dept. of Found. Studies, Logistic Eng. Univ., Chongqing, China
fYear
2010
fDate
17-19 Dec. 2010
Firstpage
203
Lastpage
207
Abstract
Firstly, Pay attention to the requirement of course timetable planning, we bring forward the urgency of timetable task in course timetable planning to measure the difficulty for implement these requirement in course timetable planning. Secondly, the related factor of the urgency of timetable task was found, and to obtain the factor´s numerical gene in urgency of timetable task, the urgency function of time and space was built up too. Lastly, the urgency of timetable task´ model was adjusted to fit different college by analytic hierarchy process.
Keywords
decision making; analytic hierarchy process; course timetable planning; numerical gene; timetable task model; urgency function; Analytical models; Contracts; Educational institutions; Processor scheduling; Schedules; Solids; AHP; course timetable planning; the urgency of timetable task; timetable;
fLanguage
English
Publisher
ieee
Conference_Titel
Apperceiving Computing and Intelligence Analysis (ICACIA), 2010 International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4244-8025-8
Type
conf
DOI
10.1109/ICACIA.2010.5709883
Filename
5709883
Link To Document