• DocumentCode
    2474865
  • Title

    Requirements engineering for time-to-market projects

  • Author

    McPhee, Christopher ; Eberlein, Armin

  • Author_Institution
    Quadrus Dev. Inc., Calgary, Alta., Canada
  • fYear
    2002
  • fDate
    2002
  • Firstpage
    17
  • Lastpage
    24
  • Abstract
    This paper identifies the essential components of a requirements engineering (RE) process and provides alternatives to the requirements analyst when deciding on a particular set of RE methods. Existing methods of choosing RE techniques are discussed, and a new technique is proposed specifically for choosing RE techniques for projects with critical time-to-market projects. The components of the essential RE process as well as many other insights into the practice of RE were identified by examining the current literature and by analyzing the data from 25 completed surveys concerning the area of RE. The survey data provides insight into the state of the practice in requirements engineering
  • Keywords
    formal specification; project management; software development management; software engineering; project management; rapid application development; requirements engineering; software development; time-to-market; Application software; Computer industry; Costs; Data analysis; Data engineering; Delay; Job shop scheduling; Large-scale systems; Phase change materials; Time to market;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering of Computer-Based Systems, 2002. Proceedings. Ninth Annual IEEE International Conference and Workshop on the
  • Conference_Location
    Lund
  • Print_ISBN
    0-7695-1549-5
  • Type

    conf

  • DOI
    10.1109/ECBS.2002.999818
  • Filename
    999818