  • Abstract
    Taking the series reactor in 10kV cascaded capacitor bank of a typical 110kV substation A as an object, and aimed at the burning fault happened when the reactor was in operation, this paper made a concrete analysis, combining theory with practice. Firstly the Power quality tracking test on 10kV bus installed the capacitor bank has been taken. Then based on the actual testing data and resonant amplification theory the reactor failure was analyzed theoretically. Finally, using simulation software PSCAD/EMTDC, the simulation model of substation A and power load was built and the simulation results verified that the 10 kV capacitor bank of substation A exists harmonic amplification effect. So the harmonic amplification effect is the main reason caused series reactor failure.
  • Keywords
    power capacitors; power harmonic filters; power supply quality; power system CAD; substation automation; PSCAD-EMTDC software; actual testing data; burning fault; cascaded capacitor bank; harmonic amplification effect; harmonic analysis; power load; power quality tracking test; resonant amplification; series reactor failure; substation A; voltage 10 kV; voltage 110 kV; PSCAD; cascaded capacitor bank; harmonic monitoring; resonant amplification; series reactor;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
  • Conference_Location
    Stockholm
  • Electronic_ISBN
    978-1-84919-732-8
  • Type

    conf

  • DOI
    10.1049/cp.2013.1047
  • Filename
    6683650