DocumentCode :
2477182
Title :
Initial assessment of the asset management process of a large industrial plant including probabilistic reliability analysis
Author :
Schwan, Michael ; Khaliq, Imran ; Khan, Sharifullah ; Ettinger, Andreas
Author_Institution :
Siemens AG, Munich, Germany
fYear :
213
fDate :
10-13 June 213
Firstpage :
1
Lastpage :
4
Abstract :
Engro Fertilizer and Siemens PTI jointly completed a study on the supply reliability situation and on the asset management process in Engro Fertilizer´s Daharki (Pakistan) plant. This project complemented earlier projects on, e.g., the overall design and the dynamic performance of the captive generation units in this industrial power supply system. Probabilistic reliability calculations validated that the reliability level throughout the plant is adequate and rather constant. A few individual exceptions are well-known to the operators and covered by explicit processes and measures. Also the asset management process was reviewed from the perspective of the plant´s overall reliability performance, and the development plans existing with Engro Fertilizer were confirmed. For certain individual assets or groups of assets, the investigations indicated the need for faster implementation in order to maintain the required risk levels for the plant´s operation.
Keywords :
asset management; industrial plants; probability; reliability; Engro Fertilizer Daharki plant; Pakistan; Siemens PTI; asset management process; industrial plants; industrial power supply system; probabilistic reliability analysis; risk levels;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location :
Stockholm
Electronic_ISBN :
978-1-84919-732-8
Type :
conf
DOI :
10.1049/cp.2013.1074
Filename :
6683677
Link To Document :
بازگشت