Abstract :
This paper describes the experience of islanding operation of a microgrid located in Provincial Electricity Authority (PEA)´s distribution network. The equipment for islanding operation and resynchronization were installed to enable the islanding operation of the microgrid. Moreover, the remote control equipment developed by PEA was installed to allow the remote operation from SCADA dispatching center. The experiment was set up to examine the performance of microgrid operation during the islanding and resynchronization process. The results show that the microgrid is capable of operation in both islanding and grid-connected modes without sacrificing the system stability and no power interruption.
Keywords :
SCADA systems; distributed power generation; distribution networks; power generation dispatch; PEA; Provincial Electricity Authority distribution network; SCADA dispatching center; grid-connected modes; innovative power system configuration; islanding resynchronization; microgrid islanding operation experience; remote control equipment;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location :
Stockholm
Electronic_ISBN :
978-1-84919-732-8
Type :
conf
DOI :
10.1049/cp.2013.1159
Filename :
6683762
Link To Document :
بازگشت