Abstract :
The main challenges for network companies today are implementing new technologies and become more efficient in every part of the asset management. NTE Nett, a Norwegian DSO, has during 2011 and 2012 completed a test project using composite poles instead of traditionally wooden poles in a 132 kV overhead line. The conclusion from the test project is that composite poles are economic favorable compared to wood poles when life cycle costs (material costs, installation costs, maintenance costs, dismantling and waste handling costs) are considered. NTE Nett will definitely consider using composite poles in other projects in the future. Especially when new lines are to be built and when old lines are to be replaced with new ones.
Keywords :
asset management; life cycle costing; poles and towers; power overhead lines; NTE Nett Norwegian DSO; Norway; asset management; composite poles; life cycle costs; power overhead lines; test project; voltage 132 kV; wooden poles;
Conference_Titel :
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location :
Stockholm
Electronic_ISBN :
978-1-84919-732-8
DOI :
10.1049/cp.2013.1216