New technologies for transmission line uprating
Author :
Carrington, Ronald J.
Author_Institution :
ECSI Corp. (dba LineSoft)
fYear :
1998
fDate :
26-30 April 1998
Firstpage :
311
Lastpage :
318
Abstract :
New technologies and methods have been applied to a 230 kV transmission line uprating project. Significant savings have been documented in field investigation efforts, data collection, design time, line outages and construction costs. Advancements in software and data collection instruments have been combined with innovative line engineering to improve the accuracy and reduce the costs of uprating projects. Laser surveying, span-by-span resagging and conductor temperature measurements have been combined to increase the ampacity rating by 30%, at a fraction of the cost of traditional uprating.
Keywords :
maintenance engineering; power transmission lines; project engineering; 230 kV; ampacity rating; conductor temperature measurements; construction costs; data collection; design time; field investigation; laser surveying; line outages; span-by-span resagging; transmission line uprating technologies; uprating project; Circuits; Clamps; Conductors; Costs; Insulation; Performance evaluation; Power transmission lines; Temperature; Transmission lines; Wire;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission & Distribution Construction, Operation & Live-Line Maintenance Proceedings, 1998. ESMO '98. 1998 IEEE 8th International Conference on
Conference_Location :
Orlando, FL, USA
Print_ISBN :
0-7803-4883-4
Type :
conf
DOI :
10.1109/TDCLLM.1998.668396
Filename :
668396
Link To Document :
بازگشت