DocumentCode
2483670
Title
Key factors influencing the decision-making of lump-sum contracting project delivery methods in China
Author
Xuetong, Wang
Author_Institution
Sch. of Bus., Guangzhou Univ., Guangzhou, China
fYear
2010
fDate
Nov. 30 2010-Dec. 2 2010
Firstpage
798
Lastpage
802
Abstract
20 factors are selected to frame a primary factor set from 38 factors obtained through literature study. The methods of Mean Score and Ranking Agreement Factor are applied to calculate the sorting order and analyze the consistency of market survey data. The results show that 17 factors concerning owner´s engineering capabilities, owner´s preferences to project construction, project properties, and lump-sum contracting market conditions exert a profound influence on the decision-making of lump-sum contracting project delivery methods. Finally, countermeasures and suggestions are proposed to promote a rapid and sound development of lump-sum contracting system in Chinese construction industry.
Keywords
civil engineering; construction industry; contracts; decision making; project engineering; project management; Chinese construction industry; decision making; lump sum contracting project delivery methods; mean score methods; project construction; ranking agreement factor; Construction industry; Contracts; Decision making; Government; Investments; Materials; Resource management; decision-making; influencing factors; lump-sum contract; project delivery methods;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Sciences and Convergence Information Technology (ICCIT), 2010 5th International Conference on
Conference_Location
Seoul
Print_ISBN
978-1-4244-8567-3
Electronic_ISBN
978-89-88678-30-5
Type
conf
DOI
10.1109/ICCIT.2010.5711165
Filename
5711165
Link To Document