    Reducing development time and cost through effective project management

  • Author

    Soldano, Dominick

  • Author_Institution
    Scitor Corp., Sunnyvale, CA, USA
  • fYear
    1995
  • fDate
    7-9 Mar 1995
  • Firstpage
    232
  • Lastpage
    235
  • Abstract
    The more complex a development effort the more difficult it is to reduce or control the project´s schedule and cost. The use of concurrent engineering in the development cycle only exacerbates the problem by increasing the number of departments and people involved at any point in the development effort. Breakdowns in the process can have devastating effects on the project schedule and double or even triple the development cost. These project elements can be effectively controlled using proven project management techniques. A number of companies involved in complex development efforts have been able to greatly reduce both development time and cost by applying these techniques
  • Keywords
    concurrent engineering; costing; economics; project management; concurrent engineering; development cost reduction; development time reduction; project management; project schedule; Acceleration; Concurrent engineering; Costs; Electric breakdown; Job shop scheduling; Manufacturing processes; Product development; Project management; Prototypes; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Southcon/95. Conference Record
  • Conference_Location
    Fort Lauderdale, FL
  • Print_ISBN
    0-7803-2576-1
  • Type

    conf

  • DOI
    10.1109/SOUTHC.1995.516108
  • Filename
    516108