• DocumentCode
    2488217
  • Title

    Combining an Optimizing Method with a Genetic Algorithm to Solve a Flowshop Scheduling Problem with Additional Resources

  • Author

    Figielska, Ewa

  • Author_Institution
    Lazarski Sch. of Commerce & Law, Warsaw
  • fYear
    2006
  • fDate
    20-22 Sept. 2006
  • Firstpage
    1080
  • Lastpage
    1086
  • Abstract
    In this paper the problem of preemptive scheduling in a flowshop with parallel unrelated machines and renewable resources is considered. A heuristic algorithm which combines an optimizing procedure solving the resource constrained scheduling problem with a genetic algorithm is proposed. The objective is to minimize makespan. A lower bound on the optimal makespan is derived. The performance of the heuristic algorithm is analyzed by a computational experiment. The results show that the proposed heuristic algorithm is an effective tool for solving large size problems.
  • Keywords
    flow shop scheduling; genetic algorithms; parallel machines; flowshop scheduling; genetic algorithm; optimal makespan; parallel unrelated machines; preemptive scheduling; resource constrained scheduling; Business; Chemical industry; Food industry; Genetic algorithms; Heuristic algorithms; Job shop scheduling; Optimization methods; Parallel machines; Space technology; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation, 2006. ETFA '06. IEEE Conference on
  • Conference_Location
    Prague
  • Print_ISBN
    0-7803-9758-4
  • Type

    conf

  • DOI
    10.1109/ETFA.2006.355463
  • Filename
    4178296