Run-time reduction in Schur complement method based transmission constrained dispatch for Monte Carlo production cost
Author
Wu, Yu-Chi ; Chang, Wei-Fu
Author_Institution
Dept. of Electr. Eng., Nat. Lien-Ho Inst. of Technol., Miao-Li, Taiwan
Volume
1
fYear
2002
fDate
13-17 Oct 2002
Firstpage
204
Abstract
In this paper, an effective Schur complement method for transmission constrained dispatch (TCD) in a commercial Monte Carlo production cost program with consideration of contingencies is presented and many run-time reduction methodologies are also proposed. Due to the special structure of the TCD problem, it is very natural to apply the Schur complement technique with good performance. Numerical testing on a real-life large-scale power system is also presented to illustrate the performance of the proposed run-time reduction methodologies.
Keywords
Monte Carlo methods; linear programming; load dispatching; power transmission economics; power transmission planning; Monte Carlo production cost program; TCD problem; contingencies; effective Schur complement method; large-scale power system; run-time reduction methodologies; transmission constrained dispatch; Availability; Costing; Costs; Flow production systems; Large-scale systems; Load forecasting; Monte Carlo methods; Power system modeling; Power system simulation; Runtime;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Technology, 2002. Proceedings. PowerCon 2002. International Conference on
Print_ISBN
0-7803-7459-2
Type
conf
DOI
10.1109/ICPST.2002.1053535
Filename
1053535
Link To Document