Abstract :
Load-frequency control is the intrinsic function of the governor in the power plants. It would be used in variant structures depend on the controller type such as PID, adaptive, fuzzy or robust. Temporary droop structure governor (TDSG) was commonly used in hydro power plants (HPP). After representation of TDSG, this paper is dedicated to introducing a procedure for tuning TDSG parameters. The technique is based on pole placement for the closed loop poles of the system. These poles correspond to the TDSG parameters that by accurate tuning of them, pole placement is accomplished. The results for tuning TDSG of Abbaspour HPP have been presented as well.
Keywords :
adaptive control; fuzzy control; hydroelectric power stations; load flow control; three-term control; Abbaspour hydro power plant; PID control; adaptive control; closed loop poles; fuzzy control; load-frequency control; optimal tuning; pole placement; temporary droop structure governor; Adaptive control; Control systems; Fuzzy control; Power generation; Programmable control; Robust control; State feedback; Three-term control; Tuning; Turbines; Governor; Hydro power plant; Root-locus plot; Temporary droop;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Conference, 2008. PECon 2008. IEEE 2nd International
Conference_Location :
Johor Bahru
Print_ISBN :
978-1-4244-2404-7
Electronic_ISBN :
978-1-4244-2405-4
Type :
conf
DOI :
10.1109/PECON.2008.4762453
Filename :
4762453
Link To Document :
بازگشت