DocumentCode :
2499867
Title :
Promoting the optimal maintenance schedule of generating facilities in open systems
Author :
Tabari, N. Mohammadi ; Ranjbar, A.M. ; Sadati, N.
Author_Institution :
Eng. Dept., Azad Univ., Tehran, Iran
Volume :
1
fYear :
2002
fDate :
13-17 Oct 2002
Firstpage :
641
Abstract :
This paper presents a dynamic programming methodology for finding the optimum preventive maintenance schedule of generating units of a GENCO in open power systems. The objective function for the GENCO is to sell electricity as much as possible, according to the market price forecast. Various constraints such as generation capacity, duration of maintenance and maintenance crew are taken into account. In a case study, introducing a GENCO with six generating units, and implementing dynamic programming, we obtain the optimal maintenance schedule over the planning period.
Keywords :
dynamic programming; maintenance engineering; power stations; power system planning; scheduling; dynamic programming methodology; generating facilities; generating units; generation capacity; maintenance crew; market price forecast; open power systems; open systems; optimal preventive maintenance schedule; power system modeling; power system planning; Dynamic programming; Dynamic scheduling; Job shop scheduling; Maintenance; Monopoly; Open systems; Power generation; Power system planning; Power system reliability; Power systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power System Technology, 2002. Proceedings. PowerCon 2002. International Conference on
Print_ISBN :
0-7803-7459-2
Type :
conf
DOI :
10.1109/ICPST.2002.1053621
Filename :
1053621
Link To Document :
بازگشت