Title
Risk based uncertainty (RibUt) of power system considering the increased of load demand
Author
Othman, M.M. ; Kasim, S.R. ; Salim, N.A. ; Musirin, I.
Author_Institution
Fac. of Electr. Eng., Univ. Teknol. MARA, Shah Alam, Malaysia
fYear
2012
fDate
6-7 June 2012
Firstpage
454
Lastpage
459
Abstract
Disturbance to the electric power system often occurs with different impact. Those power system disturbances cannot be avoided but it can be mitigated by having a premeditated action which refers to the risk assessment. This paper presents the bootstrap technique that used to assess the risk of a power system at every uncertainty level of system states and load variations. In addition, the risk based uncertainty assessment is determined when the load is increased by 20%, 40% and 60% from the base case condition. The effectiveness of bootstrap technique in risk based uncertainty assessment is tested on a case study of 24-bus IEEE Reliability Test System (RTS).
Keywords
power system faults; power system management; power system reliability; risk management; statistical analysis; 24-bus IEEE reliability test system; RTS; RibUt; bootstrap technique; electric power system disturbance; load demand; load variations; risk assessment; risk based uncertainty assessment; system states; uncertainty level; Load management; Optimization; Power system stability; Power transmission lines; Risk management; Uncertainty; Risk based uncertainty (RibUt); bootstrap technique; fuzzy set technique; increased of load demand;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering and Optimization Conference (PEDCO) Melaka, Malaysia, 2012 Ieee International
Conference_Location
Melaka
Print_ISBN
978-1-4673-0660-7
Type
conf
DOI
10.1109/PEOCO.2012.6230907
Filename
6230907
Link To Document