Title :
Estimation of multi-conductor underground cable parameters from measurements
Author :
Indulkar, C.S. ; Ramalingam, K.
Author_Institution :
Dept. of Electr. Eng., Indian Inst. of Technol., Delhi, India
Abstract :
This paper describes the method of estimating the underground cable multi-conductor parameters from measurements of voltage and current magnitudes and phase angles at the two ends of the cable. This becomes necessary to determine if an underground cable needs replacement due to changes in the cable parameters due to ageing. A single cable consisting of core and sheath in a 275 kV system is considered and the cable parameters determined from the cable dimensions, material properties and the earth conductivity. The method of evaluating the multi-conductor cable parameters from measurements is then described.
Keywords :
earthing; electric current measurement; multiconductor transmission lines; parameter estimation; underground cables; voltage measurement; current measurement; earth conductivity; multiconductor underground cable parameter estimation; phase angle; voltage 275 kV; voltage measurement; Admittance; Cable shielding; Current measurement; Impedance; Power cables; Transmission line measurements; Voltage measurement; Multi-conductor transmission lines; Parameter estimation; Underground cable modeling;
Conference_Titel :
Power Electronics, Drives and Energy Systems (PEDES) & 2010 Power India, 2010 Joint International Conference on
Conference_Location :
New Delhi
Print_ISBN :
978-1-4244-7782-1
DOI :
10.1109/PEDES.2010.5712413