DocumentCode :
2504060
Title :
Robustness in railway transportation scheduling
Author :
Salido, Miguel A. ; Barber, Federico ; Ingolotti, Laura
Author_Institution :
Dept. of Inf. Syst. & Comput., Tech. Univ. of Valencia, Valencia
fYear :
2008
fDate :
25-27 June 2008
Firstpage :
2880
Lastpage :
2885
Abstract :
Railway scheduling has been a significant issue in the railway industry. Over the last few years, numerous approaches and tools have been developed to compute railway scheduling. However, robust solutions are necessary to absorb short disruptions. In this paper, we present the robustness problem from the point of view of railway operators and we give some guidelines to measure robustness in timetabling. We have developed some formulae to compare robustness between two timetables based on the study of railway infrastructure topology and buffer times. Thus, each buffer time is pondered by some factors such as tightest tracks, number of subsequent trains, remaining stations, etc. This method is inserted in MOM1, which is a project in collaboration with the Spanish Railway Infrastructure Manager (ADIF).
Keywords :
railways; scheduling; transportation; ADIF; Spanish Railway Infrastructure Manager; railway industry; railway infrastructure topology; railway operators; railway transportation scheduling; robustness problem; Automation; Delay; Intelligent control; Job shop scheduling; Message-oriented middleware; Processor scheduling; Rail transportation; Resource management; Robust control; Robustness;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation, 2008. WCICA 2008. 7th World Congress on
Conference_Location :
Chongqing
Print_ISBN :
978-1-4244-2113-8
Electronic_ISBN :
978-1-4244-2114-5
Type :
conf
DOI :
10.1109/WCICA.2008.4594481
Filename :
4594481
Link To Document :
بازگشت