• DocumentCode
    2508054
  • Title

    Heuristics Resolution of a Constrained Hybrid Flow Shop Problem

  • Author

    Hentous, H. ; Benhammadi, F.

  • Author_Institution
    M. Polytechnic School, Algeria
  • fYear
    2006
  • fDate
    26-29 June 2006
  • Firstpage
    532
  • Lastpage
    535
  • Abstract
    Flow shop problems have been extensively studied over the last decade, and numerous works have been published in this area. This paper deals with limited intermediate storage in hybrid flow shop organisation, considering unrelated volumes depending on jobs and including support constraints. For example, in many textile production systems, there are limited buffer storage between workshops and fixed numbers of conveyance supports. Such multistage production system uses iron beams (supports) on which yarn is rolled up. After partial processing on the system, the beams are emptied out and are recovered to be used again. The optimised criterion which is studied in this paper, is makespan (the biggest achievement date of jobs is minimised).
  • Keywords
    Flow shop; Hybrid shop; Limited buffers; Parallel machines; Scheduling.; Buffer storage; Computer science; Flow production systems; Iron; Job shop scheduling; Laboratories; Parallel machines; Production systems; Textiles; Yarn; Flow shop; Hybrid shop; Limited buffers; Parallel machines; Scheduling.;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computers and Communications, 2006. ISCC '06. Proceedings. 11th IEEE Symposium on
  • ISSN
    1530-1346
  • Print_ISBN
    0-7695-2588-1
  • Type

    conf

  • DOI
    10.1109/ISCC.2006.83
  • Filename
    1691081