DocumentCode :
2509090
Title :
Progress on 140 GHz, 1 MW, CW series gyrotrons for W7-X
Author :
Jelonnek, J. ; Braune, H. ; Dammertz, G. ; Erckmann, V. ; Flamm, J. ; Gantenbein, G. ; Hollmann, F. ; Jonitz, L. ; Kasparek, W. ; Kern, S. ; Laqua, H.P. ; Lechte, C. ; Légrand, F. ; Leonhardt, W. ; Lietaer, G. ; Michel, G. ; Noke, F. ; Purps, F. ; Samarts
Author_Institution :
Assoc. EURATOM-KIT, Karlsruhe Inst. of Technol. (KIT), Karlsruhe, Germany
fYear :
2012
fDate :
23-28 Sept. 2012
Firstpage :
1
Lastpage :
2
Abstract :
The construction of the 140 GHz, 1 MW CW gyrotrons for the 10 MW ECRH system of the stellarator W7-X at IPP Greifswald is ongoing. While acceptance testing of the gyrotrons is progressing, reliable output parameters and stable production have been achieved. This report summarizes the actual status and some topical results. Focus is put on the final construction and latest parameters measured at factory-acceptance tests and site-acceptance tests. Parallel to the design optimization a new spectral measurement method has been developed, which allows time-dependent broadband spectral measurements with μs resolution for ms range pulses. Results of measurements done with W7-X gyrotrons are shown.
Keywords :
gyrotrons; millimetre wave tubes; stellarators; testing; CW series gyrotrons; ECRH system; IPP Greifswald; W7-X gyrotrons; W7-X stellarator; design optimization; factory-acceptance tests; frequency 140 GHz; power 1 MW; power 10 MW; site-acceptance tests; spectral measurement method; time-dependent broadband spectral measurements; Electron tubes; Frequency modulation; Gyrotrons; Oscillators; Power generation; Production; Reliability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Infrared, Millimeter, and Terahertz Waves (IRMMW-THz), 2012 37th International Conference on
Conference_Location :
Wollongong, NSW
ISSN :
2162-2027
Print_ISBN :
978-1-4673-1598-2
Electronic_ISBN :
2162-2027
Type :
conf
DOI :
10.1109/IRMMW-THz.2012.6380200
Filename :
6380200
Link To Document :
بازگشت