DocumentCode
2510066
Title
The maintenance strategies influence on the reliability of power plant generating units
Author
Munteanu, Florin ; Nemes, Ciprian
Author_Institution
Gheorghe Asachi Tech. Univ. of Iasi, Iasi, Romania
fYear
2012
fDate
24-26 May 2012
Firstpage
103
Lastpage
108
Abstract
Three different maintenance strategies are presented from theoretical approach to a practical study case: first come - first served - FCFS, relative priority - RP and total priority - TP. The useful results shows how to include the maintenance strategies in reliability calculations and their influence on the reliability indices like steady-state point availability, steady-state time interval reliability, MTTF and system´s reliability. An industry practical application related to reliability-maintenance relationship for the generating units of SH Râmnicu-Vâlcea County, a Romanian Hydro Power Company is included in this paper.
Keywords
hydroelectric power stations; maintenance engineering; power generation reliability; FCFS; MTTF; Romanian Hydro Power Company; SH Râmnicu-Vâlcea County; first come-first serve; maintenance strategies; power plant generating units reliability; reliability calculations; reliability-maintenance relationship; steady-state point availability; steady-state time interval reliability; system reliability; theoretical approach; total priority; Approximation methods; Maintenance engineering; Mathematical model; Reliability theory; Software reliability; Steady-state;
fLanguage
English
Publisher
ieee
Conference_Titel
Optimization of Electrical and Electronic Equipment (OPTIM), 2012 13th International Conference on
Conference_Location
Brasov
ISSN
1842-0133
Print_ISBN
978-1-4673-1650-7
Electronic_ISBN
1842-0133
Type
conf
DOI
10.1109/OPTIM.2012.6231761
Filename
6231761
Link To Document