DocumentCode :
2510894
Title :
Multi-level fuzzy synthesis evaluation on construction supply chain risk
Author :
Xiao, Wenzhen ; Liu, Zhenyuan ; Zhong, Weihua
Author_Institution :
Control Sci. & Eng. Dept., Huazhong Univ. of Sci. & Technol., Wuhan, China
fYear :
2011
fDate :
23-25 May 2011
Firstpage :
266
Lastpage :
269
Abstract :
Due to the fuzziness of construction supply chain risk, a two-level fuzzy synthesis evaluation model, based on the object of construction supply chain of raw materials in cascade hydropower plants along Yalong River, has been developed using related fuzzy mathematics theories in this paper. Furthermore, the application of entropy method in determining the weight minimizes artificial errors, leading to a fairer way to compute the weight. Finally such a model is employed in real applications to demonstrate its feasibility in the evaluation of construction supply chain risk.
Keywords :
construction; entropy; fuzzy set theory; hydroelectric power; raw materials; risk management; supply chain management; Yalong River; cascade hydropower plant; construction supply chain risk; entropy method; fuzzy mathematics theory; multilevel fuzzy synthesis evaluation; raw material; Entropy; Hydroelectric power generation; Indexes; Raw materials; Risk management; Rivers; Supply chains; construction supply chain risk; entropy method; fuzzy synthesis evaluation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2011 Chinese
Conference_Location :
Mianyang
Print_ISBN :
978-1-4244-8737-0
Type :
conf
DOI :
10.1109/CCDC.2011.5968184
Filename :
5968184
Link To Document :
بازگشت