DocumentCode :
2513370
Title :
Simulation-based optimization methods for caster operation under time confliction condition in steelmaking plant
Author :
LUO, Xiaochuan ; Na, Chongzheng ; Liu, Rujiu
Author_Institution :
Key Lab. of Integrated Autom. of Process Ind., Northeastern Univ., Shenyang, China
fYear :
2011
fDate :
23-25 May 2011
Firstpage :
880
Lastpage :
884
Abstract :
In steelmaking process, the process times of machines, such as LD Converter and Refinery etc. are often different with the process time of them in the schedule for the reason of Metallurgical Processes principle. When those process time change, caster operator must increase/decrease the speed of caster machine to prevent the shutdown of caster machine. At the same time, caster operator must also give the cooling water flow rates of cooling system according to the speed. Up to now, caster operator sets the speed and flow rates by personal experience manually. This paper present a simulation-based methods for caster operation under time confliction condition in steelmaking plant. Data experiments illustrate the efficiency of the simulation-based methods.
Keywords :
casting; cooling; industrial plants; machinery; metallurgy; production equipment; steel manufacture; caster machine; caster operation; cooling water flow rate; metallurgical process; process time; simulation-based optimization; steelmaking plant; steelmaking process; time confliction condition; Casting; Cooling; Dynamic scheduling; Mathematical model; Optimization; Slabs; Steel; Continues caster; Operation Optimization; steelmaking process;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2011 Chinese
Conference_Location :
Mianyang
Print_ISBN :
978-1-4244-8737-0
Type :
conf
DOI :
10.1109/CCDC.2011.5968307
Filename :
5968307
Link To Document :
بازگشت