DocumentCode
2514568
Title
Scheduling parallelizable imprecise computations on multiprocessors
Author
Yu, Albert C. ; Lin, Kwei-Jay
Author_Institution
Dept. of Comput. Sci., Illinois Univ., Urbana-Champaign, IL, USA
fYear
1991
fDate
30 Apr-2 May 1991
Firstpage
531
Lastpage
536
Abstract
In a real-time application that supports imprecise computation, each task is logically composed of a hard task and a soft task. The hard task must be completed before its deadline. The soft task is an optional task which may not be executed to completion, if insufficient computational resources are available. In the presented model, each task may be parallelized and executed on multiple processors with a multiprocessing overhead which is assumed to be a linear function of the degree of parallelism. It is shown that the problem of time allocation in such a real-time application can be formulated and solved as a linear programming problem. An algorithm is given for constructing a multiprocessor schedule from the linear programming solution. This algorithm guarantees the multiprocessing overhead generated in the multiprocessor schedule not to exceed a linear upper bound
Keywords
linear programming; multiprocessing programs; parallel algorithms; scheduling; deadline; hard task; linear programming; linear upper bound; multiprocessor schedule; optional task; parallelism; parallelizable imprecise computations; soft task; time allocation; Algorithm design and analysis; Concurrent computing; Linear programming; NASA; Parallel algorithms; Parallel processing; Processor scheduling; Real time systems; Scheduling algorithm; Timing;
fLanguage
English
Publisher
ieee
Conference_Titel
Parallel Processing Symposium, 1991. Proceedings., Fifth International
Conference_Location
Anaheim, CA
Print_ISBN
0-8186-9167-0
Type
conf
DOI
10.1109/IPPS.1991.153832
Filename
153832
Link To Document