• DocumentCode
    2516090
  • Title

    Accelerating products under due-date oriented dispatching rules in semiconductor manufacturing

  • Author

    Rose, Oliver

  • Author_Institution
    Inst. of Comput. Sci., Wurzburg Univ., Germany
  • Volume
    2
  • fYear
    2003
  • fDate
    7-10 Dec. 2003
  • Firstpage
    1346
  • Abstract
    In semiconductor manufacturing facilities, there is often the need to speed up certain product types. This is usually done by either assigning higher priorities or by reducing due dates. We study the effects of accelerating one product type by a tighter due date on the on-time delivery performance of the other products manufactured. It turns out that the results depend on the considered factory, its load, and the accelerated product. As a consequence, it will be hard for production planners to find simple rules of thumb for the effects of accelerating products. In general, detailed simulation experiments will be required.
  • Keywords
    integrated circuit manufacture; manufacturing processes; production control; production planning; time to market; due-date oriented dispatching rules; on-time delivery performance; product acceleration; semiconductor manufacturing industry; simulation experiment; Acceleration; Chromium; Computer aided manufacturing; Computer science; Dispatching; Electronics industry; Production facilities; Pulp manufacturing; Semiconductor device manufacture; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2003. Proceedings of the 2003 Winter
  • Print_ISBN
    0-7803-8131-9
  • Type

    conf

  • DOI
    10.1109/WSC.2003.1261571
  • Filename
    1261571