A novel approach to allocate transmission embedded cost based on MW-Mile method under deregulated environment
Author :
Majidi Q, M. ; Ghazizadeh, M.S. ; Afsharnia, S.
Author_Institution :
Dept. of Electr. & Comput. Eng., Univ. of Tehran, Tehran
fYear :
2008
fDate :
6-7 Oct. 2008
Firstpage :
1
Lastpage :
6
Abstract :
In a competitive electricity market, the transmission costs should be fairly distributed amongst the users of the transmission facilities, in order to attain optimal usage of the transmission facilities and to provide correct economic signal for future generation planning and load placement. In this paper, transmission costs are divided into three components; i.e. actual transmission usage cost, unused capacity cost, and network reliability cost; and is distributed amongst the users in a non-discriminatory manner. The proposed algorithm has been implemented on a 9-bus test system and the results are compared with corresponding MW-Mile based method results.
Keywords :
costing; power markets; power transmission economics; 9-bus test system; MW-Mile method; actual transmission usage cost; electricity market; network reliability cost; transmission embedded cost allocation; transmission facilities; unused capacity cost; Cost function; Distributed power generation; Electricity supply industry; Electricity supply industry deregulation; Environmental economics; Investments; Power generation; Power generation economics; Power system economics; Signal generators; Embedded cost; MW-Mile method; cost allocation; reliability; unused capacity;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Power Conference, 2008. EPEC 2008. IEEE Canada
Conference_Location :
Vancouver, BC
Print_ISBN :
978-1-4244-2894-6
Electronic_ISBN :
978-1-4244-2895-3
Type :
conf
DOI :
10.1109/EPC.2008.4763344
Filename :
4763344
Link To Document :
بازگشت