DocumentCode
2516296
Title
A novel approach to allocate transmission embedded cost based on MW-Mile method under deregulated environment
Author
Majidi Q, M. ; Ghazizadeh, M.S. ; Afsharnia, S.
Author_Institution
Dept. of Electr. & Comput. Eng., Univ. of Tehran, Tehran
fYear
2008
fDate
6-7 Oct. 2008
Firstpage
1
Lastpage
6
Abstract
In a competitive electricity market, the transmission costs should be fairly distributed amongst the users of the transmission facilities, in order to attain optimal usage of the transmission facilities and to provide correct economic signal for future generation planning and load placement. In this paper, transmission costs are divided into three components; i.e. actual transmission usage cost, unused capacity cost, and network reliability cost; and is distributed amongst the users in a non-discriminatory manner. The proposed algorithm has been implemented on a 9-bus test system and the results are compared with corresponding MW-Mile based method results.
Keywords
costing; power markets; power transmission economics; 9-bus test system; MW-Mile method; actual transmission usage cost; electricity market; network reliability cost; transmission embedded cost allocation; transmission facilities; unused capacity cost; Cost function; Distributed power generation; Electricity supply industry; Electricity supply industry deregulation; Environmental economics; Investments; Power generation; Power generation economics; Power system economics; Signal generators; Embedded cost; MW-Mile method; cost allocation; reliability; unused capacity;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Power Conference, 2008. EPEC 2008. IEEE Canada
Conference_Location
Vancouver, BC
Print_ISBN
978-1-4244-2894-6
Electronic_ISBN
978-1-4244-2895-3
Type
conf
DOI
10.1109/EPC.2008.4763344
Filename
4763344
Link To Document