• DocumentCode
    2517436
  • Title

    Assessment of the suitability of the European 400 kV grid to supply the ITER load

  • Author

    Maschio, A. ; Bertolini, E. ; Bottereau, J.M. ; Crisford, D. ; D´Andrea, G. ; DeLorenzi, A. ; Geeves, S. ; Lefebvre, H. ; Murphy, G. ; Scarpellini, P.

  • Volume
    1
  • fYear
    1995
  • fDate
    30 Sep-5 Oct 1995
  • Firstpage
    178
  • Abstract
    The European Union ITER Home Team analysed the possibility of feeding ITER directly from the 400 kV grid. The study was based on the assumption that ITER will be located on the sites where the 400 kV grid feeds fusion experiments in Europe at present, and was performed in cooperation with the Electric Companies concerned. This study shows, as a first approximation, the ability of the European Grid to supply the ITER load, provided that measures such as increasing the power reserve and providing reactive power compensation are taken as the site location demands
  • Keywords
    Tokamak devices; fusion reactor design; fusion reactors; power supplies to apparatus; 400 kV; European Grid; ITER load; power reserve; reactive power compensation; site location demands; Circuits; Energy measurement; Europe; Feeds; Laboratories; Performance evaluation; Power generation; Pulsed power supplies; Reactive power; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fusion Engineering, 1995. SOFE '95. Seeking a New Energy Era., 16th IEEE/NPSS Symposium
  • Conference_Location
    Champaign, IL
  • Print_ISBN
    0-7803-2969-4
  • Type

    conf

  • DOI
    10.1109/FUSION.1995.534197
  • Filename
    534197