DocumentCode
2518265
Title
Empirical Transformation of Job Shop Scheduling Problem to the Hydraulic Networks Problem in a Water Distribution System
Author
Cruz-Chávez, Marco Antonio ; Avila-Melgar, Erika Yesenia ; Pérez, Fredy Juárez ; Torres-Sánchez, Wiston G.
Author_Institution
CIICAp, Univ. Autonoma del Estado de Morelos, Cuernavaca, Mexico
fYear
2009
fDate
22-25 Sept. 2009
Firstpage
76
Lastpage
81
Abstract
In this paper an analogy of the job shop scheduling problem to the hydraulic networks problem is presented by mapping this model of scheduling, using as a base the disjunctive graph model. The mapping carried out allows visualization of the hydraulic networks problem as an NP-complete model with constraints defined in the job shop scheduling problem. The mapping presented indicates that the hydraulic networks problem is a difficult problem to solve by using an approach with the constraints of an NP-complete problem.
Keywords
computational complexity; graph theory; job shop scheduling; water supply; NP-complete model; disjunctive graph model; hydraulic network problem; job shop scheduling problem; water distribution system; Automotive engineering; Costs; Job shop scheduling; Mesh networks; NP-complete problem; NP-hard problem; Polynomials; Quality of service; Robots; Visualization;
fLanguage
English
Publisher
ieee
Conference_Titel
Electronics, Robotics and Automotive Mechanics Conference, 2009. CERMA '09.
Conference_Location
Cuernavaca, Morelos
Print_ISBN
978-0-7695-3799-3
Type
conf
DOI
10.1109/CERMA.2009.33
Filename
5342010
Link To Document