DocumentCode :
2522365
Title :
Cost and time trade-off of scheduling grid tasks over grooming capable networks
Author :
Szabo, N. ; Gal, J. ; Ladanyi, Akos ; Cinkler, T.
fYear :
2008
fDate :
Sept. 28 2008-Oct. 2 2008
Firstpage :
1
Lastpage :
17
Abstract :
In this presentation, the effect of cost and time constraints on scheduling grid tasks over grooming capable networks is discussed. Framework optimization, heuristics for speeding up the algorithm and mutual impact of networking and processing are suggested.
Keywords :
cost-benefit analysis; grid computing; heuristic programming; optical fibre networks; scheduling; telecommunication computing; telecommunication network planning; telecommunication traffic; cost; grid tasks; grooming capable networks; heuristics; scheduling; time; Cost function; Pareto optimization; Time division multiplexing; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Network Strategy and Planning Symposium, 2008. Networks 2008. The 13th International
Conference_Location :
Budapest
Print_ISBN :
978-963-8111-68-5
Type :
conf
DOI :
10.1109/NETWKS.2008.4763704
Filename :
4763704
Link To Document :
بازگشت