Abstract
This paper presents a simulation study of the proposed Frontier line from Wyoming to California through Utah and Nevada as a multi-terminal high voltage direct current (HVDC) transmission system. A four-terminal HVDC link is modeled with one terminal in each state. Various faults are simulated at different locations of the transmission link to observe the dynamic performance of the system. Results from the simulation study show that a multi-terminal HVDC link is technically feasible from Wyoming to California.
Keywords
HVDC power transmission; California; Frontier line; Nevada; Utah; Wyoming; high voltage direct current transmission system; multiterminal HVDC system; Energy resources; HVDC transmission; Inverters; Natural gas; Potential energy; Power transmission lines; Production; Rectifiers; Voltage; Wind energy; Frontier Line; Multi-Terminal HVDC System; Transient Simulation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location
Pittsburgh, PA
ISSN
1932-5517
Print_ISBN
978-1-4244-1905-0
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2008.4596081
Filename
4596081
Link To Document