DocumentCode
2535620
Title
FMS scheduling: A crucial element in an expert system control structure
Author
Kusiak, Andrew
Author_Institution
University of Manitoba, Winnipeg, Manitoba, Canada
Volume
3
fYear
1986
fDate
31503
Firstpage
653
Lastpage
658
Abstract
In this paper a structure of the manufacturing expert system is presented. This system is to control three subsystems: process planning, programming of robots and machines and production planning. One of the basic elements of the production planning system is the production scheduling. A scheduling framework together with the heuristic scheduling algorithm are developed. The algorithm is illustrated on a numerical example.
Keywords
Control systems; Expert systems; Flexible manufacturing systems; Job shop scheduling; Process control; Process planning; Production planning; Production systems; Pulp manufacturing; Robot programming;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation. Proceedings. 1986 IEEE International Conference on
Type
conf
DOI
10.1109/ROBOT.1986.1087637
Filename
1087637
Link To Document