• DocumentCode
    2536839
  • Title

    Operating the Irish power system with increased levels of wind power

  • Author

    Tuohy, Aidan ; Denny, Eleanor ; Meibom, Peter ; Barth, Rudiger ; Malley, Mark O.

  • Author_Institution
    Sch. of Electr., Univ. Coll. Dublin, Dublin
  • fYear
    2008
  • fDate
    20-24 July 2008
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper summarises some of the main impacts of large amounts of wind power installed in the island of Ireland. Using results from various studies performed on this system, it is shown that wind power will impact on all time frames, from seconds to daily planning of the system operation. Results from studies examining operation of the system with up to approximately 40% of electricity provided by wind show that some of the most important aspects to be considered include the type of wind turbine technology, the provision of reserve to accommodate wind forecasting error and the method used to plan plant schedules.
  • Keywords
    load forecasting; power generation planning; power generation scheduling; wind turbines; Irish power system; plant schedules; wind forecasting error; wind power installation; wind turbine technology; Frequency; Induction generators; Power system interconnection; Power system planning; Power systems; Renewable energy resources; Wind energy; Wind energy generation; Wind forecasting; Wind turbines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
  • Conference_Location
    Pittsburgh, PA
  • ISSN
    1932-5517
  • Print_ISBN
    978-1-4244-1905-0
  • Electronic_ISBN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PES.2008.4596389
  • Filename
    4596389