Abstract
This paper summarises some of the main impacts of large amounts of wind power installed in the island of Ireland. Using results from various studies performed on this system, it is shown that wind power will impact on all time frames, from seconds to daily planning of the system operation. Results from studies examining operation of the system with up to approximately 40% of electricity provided by wind show that some of the most important aspects to be considered include the type of wind turbine technology, the provision of reserve to accommodate wind forecasting error and the method used to plan plant schedules.
Keywords
load forecasting; power generation planning; power generation scheduling; wind turbines; Irish power system; plant schedules; wind forecasting error; wind power installation; wind turbine technology; Frequency; Induction generators; Power system interconnection; Power system planning; Power systems; Renewable energy resources; Wind energy; Wind energy generation; Wind forecasting; Wind turbines;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location
Pittsburgh, PA
ISSN
1932-5517
Print_ISBN
978-1-4244-1905-0
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2008.4596389
Filename
4596389
Link To Document