• DocumentCode
    2537413
  • Title

    Scheduling AND/OR precedence constraints jobs to minimize the makespan by mapping from CPM to AND/OR network

  • Author

    Tao, Wang ; Da-Xin, Liu

  • Author_Institution
    Sch. of Comput. Sci. & Technol., Harbin Eng. Univ., China
  • fYear
    2005
  • fDate
    17-19 Aug. 2005
  • Firstpage
    169
  • Lastpage
    172
  • Abstract
    Scheduling AND/OR precedence constraints jobs to produce a feasible schedule is a well studied problem in real time jobs scheduling field; many approaches and algorithms are presented to solve this problem. However, few of them use the project scheduling method applied in the real time jobs scheduling. In this paper, a new idea of scheduling the AND/OR precedence constraints by a network analysis method CPM is introduced. The minimum makespan of AND/OR precedence constraints jobs is the important performance objective. The AND/OR and CPM models are introduced and used to schedule the jobs with precedence constraints. Moreover, an ES algorithm is presented to solve the problem of scheduling AND/OR precedence constraints to minimize the makespan. The algorithm can compute the job s ES in polynomial time and its capacity is O (na+nolog no+ na).
  • Keywords
    computational complexity; critical path analysis; minimisation; processor scheduling; real-time systems; AND/OR network; AND/OR precedence constraints jobs; CPM; ES algorithm; network analysis; polynomial time; project scheduling; real time jobs scheduling; Computer applications; Computer networks; Computer science; Concurrent computing; Delay; Polynomials; Processor scheduling; Real time systems; Scheduling algorithm; Stochastic processes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Embedded and Real-Time Computing Systems and Applications, 2005. Proceedings. 11th IEEE International Conference on
  • ISSN
    1533-2306
  • Print_ISBN
    0-7695-2346-3
  • Type

    conf

  • DOI
    10.1109/RTCSA.2005.89
  • Filename
    1541074