• DocumentCode
    2537780
  • Title

    Oil filled switchgear replacement-type testing and system issues

  • Author

    Headley, T.

  • Author_Institution
    British Short Circuit Testing Station, Hebburn
  • fYear
    1998
  • fDate
    36054
  • Firstpage
    42491
  • Abstract
    Summary form only given. There is a growing interest in the economic replacement of ageing oil-filled switchgear. Whether whole switchboards are renewed or partial replacement (sometimes referred to as retrofitting) is implemented, the same obligation exists to achieve appropriate performance levels. In this paper, the author details how the successful replacement of oil-filled switchgear requires an overall strategy taking into account not only equipment but also a review of the system concerned
  • Keywords
    switchgear insulation; aged oil-filled switchgear; economic replacement; maintenance strategy; partial replacement; performance levels; power system issues; retrofitting; switchboards; switchgear renewal; type testing;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Can I Afford to Lose My Main Switchboard? - Managing Aged Oil-Filled Switchgear (Digest No. 1998/479), IEE Colloquium on
  • Conference_Location
    Birmingham
  • Type

    conf

  • DOI
    10.1049/ic:19980864
  • Filename
    744072