• DocumentCode
    2538737
  • Title

    Modeling reliability growth late in development

  • Author

    Clark, Jeffrey A.

  • Author_Institution
    MITRE Corp., Bedford, MA, USA
  • fYear
    1999
  • fDate
    18 -21 Jan 1999
  • Firstpage
    201
  • Lastpage
    207
  • Abstract
    Reliability is often overlooked during early developmental testing when the focus is on improving system performance. As a result, rapid reliability growth programs are frequently initiated late in development, just before the system enters production. The widely-used AMSAA reliability growth model is difficult to apply on such programs because it is a cumulative function of test time and the number of failures observed; therefore, it usually projects that an excessive amount of testing is required to overcome a period of low reliability, even at high growth rates. This paper formulates an alternative model for projecting reliability growth late in development that does not suffer from this problem. The model also provides a framework for reliability growth on system acquisition programs that utilize short development cycles, such as spiral development. An example application of the model on the AWACS RSIP reliability growth program is presented and discussed
  • Keywords
    failure analysis; reliability theory; testing; development cycles; developmental testing; failures number; growth rate; reliability growth modelling; spiral development; system acquisition programs; test time; Control systems; Failure analysis; Frequency; Materials reliability; Materials testing; Production systems; Reliability engineering; Spirals; System performance; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability and Maintainability Symposium, 1999. Proceedings. Annual
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-5143-6
  • Type

    conf

  • DOI
    10.1109/RAMS.1999.744119
  • Filename
    744119