DocumentCode :
2540460
Title :
Scheduling job shops with delays
Author :
Lou, Sheldon X C ; Ryzin, Garrett Van ; Gershwi, Stanley B.
Author_Institution :
Massachusetts Institute of Technology
Volume :
4
fYear :
1987
fDate :
31837
Firstpage :
1345
Lastpage :
1349
Abstract :
In this paper, the presence of delay in a job shop is addressed. We show that delay is an important consideration in many manufacturing systems that are modeled as continuous flow processes. A scheduling policy for a job shop with delays is then derived using theoretical arguments and heuristics.
Keywords :
Continuous production; Control systems; Delay effects; Delay systems; Flow production systems; Job shop scheduling; Manufacturing processes; Manufacturing systems; Processor scheduling; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation. Proceedings. 1987 IEEE International Conference on
Type :
conf
DOI :
10.1109/ROBOT.1987.1087914
Filename :
1087914
Link To Document :
بازگشت