DocumentCode :
2542403
Title :
Hydrothermal bilateral contract negotiation with energy and financial risks analysis
Author :
Mateus, J.C. ; Cuervo, P. ; Jannuzzi, D.P.
Author_Institution :
Dept. of Electr. Eng., Brasilia Univ., Brasilia
fYear :
2008
fDate :
20-24 July 2008
Firstpage :
1
Lastpage :
8
Abstract :
This paper presents a methodology composed of two parts to facilitate the decision making process of hydrothermal generation companies (gencos) during the negotiation of bilateral contracts. In the first part is established a procedure for determining the risk of deficit of Energy Availability (EA) introduced by a new contract under negotiation given the uncertainty in the concept of ensured energy (EE) of hydro units. In the second part, the required buyer modulation along the period of contracts due to load seasonal variation is analyzed in terms of the impact on the gencos risk to unfavorable prices (or negative spot exposition) given the uncertainty in spot prices. Furthermore, the impact on the risk of negative spot exposition is also analyzed with respect to the offered monthly flexibility option to the buyer for compensating unpredicted load variations. Results show that using this tool, gencos can have important information during the negotiation process. This information includes obtaining the risk of EA deficit, the more convenient contractual price, the risk of negative exposition to the spot market price and the maximum convenient flexibility conditions. Several numerical cases are presented to illustrate how this tool supports the decision process during the negotiation of the contractual conditions.
Keywords :
contracts; decision making; hydrothermal power systems; pricing; risk analysis; bilateral contracts; decision making process; energy availability; energy risks analysis; financial risks analysis; hydrothermal bilateral contract negotiation; hydrothermal generation companies; load seasonal variation; negotiation process; spot prices; unfavorable prices; unpredicted load variations; Contracts; Decision making; Electricity supply industry deregulation; Hydroelectric power generation; Load forecasting; Load management; Regulators; Risk analysis; Risk management; Uncertainty; Bilateral Contracts; Hydropower Generators; Monte Carlo Simulation; Risk Management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location :
Pittsburgh, PA
ISSN :
1932-5517
Print_ISBN :
978-1-4244-1905-0
Electronic_ISBN :
1932-5517
Type :
conf
DOI :
10.1109/PES.2008.4596698
Filename :
4596698
Link To Document :
بازگشت