DocumentCode :
2542870
Title :
Instantaneous wind power penetration in Jeju Island
Author :
Park, Jin-woo ; Park, Young-ho ; Moon, Seung-Il
Author_Institution :
Sch. of Electr. Eng., Seoul Nat. Univ., Seoul
fYear :
2008
fDate :
20-24 July 2008
Firstpage :
1
Lastpage :
7
Abstract :
Recently, many wind power generators are installed through the sponsorship of government in Korea. Jeju is the largest island in Korea with high wind energy potential. It has autonomous electric grid and its electrical load reaches over 600 MW. When the wind power possesses a significant portion of a power system, it can cause various problems. So, determining maximum penetration limit that guarantees the stability of the Jeju power system is important. In this paper, a calculation method that determines the maximum penetration limit of the small isolated power system is presented and coordinating operation procedure of wind farms, generators, and an HVDC is proposed. The suggested methods are applied to Jeju Island case.
Keywords :
HVDC power convertors; power grids; power system stability; wind power; HVDC; Jeju island; autonomous electric grid; isolated power system; power system stability; wind energy; wind power generators; wind power penetration; wind rejection; HVDC transmission; Inverters; Power generation; Power system interconnection; Power system stability; Power systems; Wind energy; Wind energy generation; Wind farms; Wind speed; High Wind Penetration; Isolated Power System; Wind Power; Wind Rejection;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location :
Pittsburgh, PA
ISSN :
1932-5517
Print_ISBN :
978-1-4244-1905-0
Electronic_ISBN :
1932-5517
Type :
conf
DOI :
10.1109/PES.2008.4596724
Filename :
4596724
Link To Document :
بازگشت